Thanlyin Project
We sold a pyrolysis system to the Than Hlyn Thabawa Meditation Center, and it will start running in October 2019. This machine will decompose 3.0 m3 to 7.0 m3 (approx. 2 tons) of waste without using fuel for burning. As a result, the Center’s running costs will decrease.
The machine is designed not to use flames, so it is not like other incinerators. It does not require any change to interior walls of buildings for 3 to 5 years, and maintenance of the system is easy to perform.